Systems build and integration
The systems build team is responsible for:
-
The mechanical layout of the control panels and wiring/piping
-
The installation of the control panel onto the machine/equipment, integrating wiring and piping
-
Machine power-up, IO checks and emergency stop network is working
-
Sign-off electrical checks and get the machine ready for software install
During assembly of the project, the build documentation acts as the ‘Master Set’. Any agreed changes or revisions are entered onto the drawings. On build completion the documentation set is passed back to the design office for the updates to be formally recorded before the release of final documentation.